Overhead line

CASE STUDY: CONNECTION TO A NEW HV SUBSTATION
CASE STUDY: CONNECTION TO A NEW HV SUBSTATION
Ring main connection of a new 132kV HV substation to existing overhead lines.
CASE STUDY: CONNECTION TO A NEW HV SUBSTATION
Ring main connection of a new 132kV HV substation to existing overhead lines.
CASE STUDY: PROTECTION FOR A HIGH VOLTAGE MOTOR
Replacement of obsolete discrete protection relays with a multifunctional digital relay to protect a 1100kW 6.6kV motor.
CASE STUDY: IMPROVING EVAPORATION EFFICIENCY
A producer of high-quality malt extract syrups used mainly in the brewing and related industries was faced with rapidly increasing energy costs. The process was batch-wise preparation of a 13% solids wort from malted barley followed by evaporation in a triple effect evaporator set followed by concentration to 75 - 80% solids in a finishing evaporator vessel heated by live steam.